KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  4-4-2013
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Installed Nutplates in Fuselage and HS

The left side of the fuselage had a #6 nutplate riveted in place. The hole under the HS thru the longeron was tapped for a #6 screw. The holes in the underside of the HS were drilled for the nutplates.
' style=

The nutplate in place on the left side of the fuselage

The nutplate in place on the left side of the fuselage

' style=

The tapped hole thru the longeron

The tapped hole thru the longeron

' style=

The HS drilled for the nutplates

The HS drilled for the nutplates

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.