Powered By Kitlog Pro v2.0
Baker's RV-6
RV-6
All
6-4-2012
< Previous Log Entry
Next Log Entry >
Date:
6-4-2012
Number of Hours:
1.00
Manual Reference:
Brief Description:
Added Patches to Canopy Fairing
The center section of the canopy fairing needed to be patched. Various sizes of patches were cut out and then mixed with epoxy. The patches were placed on the top and underside of the fairing.
The patches cut out
The patches and the plastic
Patches laid over the top of the fairing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.