KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  3-17-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Finished Flap Wires/Comm Antenna Coax Wires

The flap wires that were removed and will be unused had heat shrink applied over the terminals. The correct flap wires were connected to the flap switch. The wire that had been runned thru the elevator control tube tunnel as a common ground was cut and then removed, as it is now unnecessary.

Two lengths of coax were cut for the two commantennas. BNC connectors were added to one end on each cable.
' style=

The flap wires with heat-shrink

The flap wires with heat-shrink

' style=

The unused ground wire

The unused ground wire

' style=

Comm coax antenna wires

Comm coax antenna wires

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.