Brief Description: Drilled Center of Right Spar for Wiring
The center of the right main spar was drilled for the wires that will be run thru the area. A plastic bushing with an ID of 1/2", OD of 5/8" was used to check the cutout. The center of the left spar was also checked and the cutout was enlarged slightly.
The center fuselage was drilled for a second hole, 5/8" diameter. The snap bushings were installed in the center fuselage in both holes. Wires were run thru the bushings.