Brief Description: Added Carb Heat Cable Clamp/New Door Control
The air filter was removed and taken apart. The right side of the filter was sanded down. The new bracket for the right hangar was drilled in place. A new ram door control arm was made. The old arm was drilled out. The new arm was drilled to the ram air door.