KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  1-7-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Carb Heat Box Deck Center Drilled Out

The deck's center was drilled out. The edges were smoothed with files and then the Scotchbrite pad in the die grinder. An extension was also drilled out for the ram air door control handle. This area was marked on the inlet.

A length of .050" X 3/4" was cut and smoothed. This will serve as the ram air door control handle. The piece had a 90 degree bend placed in it.
' style=

The inlet and nutplates

The inlet and nutplates

' style=

The deck and the inlet

The deck and the inlet

' style=

The carb heat box and the handle

The carb heat box and the handle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.