KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  1-5-2012
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Cut Out Ram Air Door

I made a copy of the drawings from the James Cowling instructions. The ram air door drawing was cut out and transferred to a piece of cardboard. The cardboard was placed into the air filter opening to check the fit. The door was cut out of .040" material and then drilled to the hinge.
' style=

The ram air door templates and the actual door

The ram air door templates and the actual door

' style=

The door attached to the hinge

The door attached to the hinge

' style=

The door in the open position

The door in the open position

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.