KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-20-2011
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Installing the Firewall Pass-Through

After routing the oil door shutter cable, I drilled a hole in the firewall for the pass-through. I used the paper template to locate the screw holes. I found that the 1 1/8" hole drilled using the hole cutter made an oblong hole. One of the screw holes was very close to the edge. I spent a lot of time making the holes line up for the pass-through. Finally the holes were finished and the pass-through is attached to the firewall.
' style=

The cable in a loop and attached to an Adel clamp

The cable in a loop and attached to an Adel clamp

' style=

The pass-through

The pass-through

' style=

The inside of the pass-through

The inside of the pass-through

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.