KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-26-2011
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Drilled Doublers to Side and Aft Baffles

I continued drilling the oil cooler doubler to the aft baffle and the corner angle bracket doubler to the side baffle. I drilled out the rivets holding the crosspiece to the old side baffle and then drilled that crosspiece bracket to the new side baffle. The oil shutter was also drilled to the oil cooler doubler for the bolt locations and three rivet locations. After drilling the oil cooler doubler to the aft baffle, holes were drilled in the corners of the cutout for the oil cooler in the baffle. The Dremel was used to cut out the sides of the rectangle cutout and the edges were smoothed out.
' style=

The cutout for the oil cooler

The cutout for the oil cooler

' style=

The doublers for the side baffle

The doublers for the side baffle

' style=

The oil shutter and the doubler

The oil shutter and the doubler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.