KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  2-24-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Installed Mixture Cable Hardware

I found the small bearing to be inserted in the mixture arm on the carburetor and pushed that into the hole in the arm. An Adel clamp was placed around the mixture cable forward of the instrument panel. The attaching hardware was installed on the engine end of the mixture cable.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.