KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  4-1-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Installed the Rod for the Canopy Rail

I drilled out the bottom rivet in the top center of the F-607 bulkhead and then drilled that hole up to 1/4" size for the rod from the canopy rail. I inserted the rail and then notched the top baggage bulkhead for the rail and the nut attached to it.
' style=

The rod positioned between the canopy rail and the bulkhead

The rod positioned between the canopy rail and the bulkhead

' style=

The top baggage bulkhead notched out

The top baggage bulkhead notched out

' style=

The baggage bulkhead in place with the notch for the support rod

The baggage bulkhead in place with the notch for the support rod

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.