KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-10-2009
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Photos 2-Wiring, Ground Block Positioned
' style=

Wires on the right side of the instrument panel

Wires on the right side of the instrument panel

' style=

Ground block and wiring

Ground block and wiring

' style=

Ground block positioned on subpanel flange

Ground block positioned on subpanel flange

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.