KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-5-2009
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Right Fuel Vent Tube/Aux Fuel Pump Doubler

I completed the bending of the new fuel vent tube for the right side. I added the AN nuts and then flared the ends, This one looks much better! I reworked the left fuel vent tube to clean up the bends. I drilled four #19 holes along the vent tube path. I will attach Adel clamps at these points. I needed to order #8 nuts and washers so that I can fasten the screws to the brackets, so I ordered some from Aircraft Spruce.

I taped the aux fuel pump doubler in place and drilled it to the firewall with a #40 bit. The holes in the doubler were then countersunk.

I swept out the fuselage.
' style=

Right fuel vent tube in place

Right fuel vent tube in place

' style=

The left fuel vent tube reworked

The left fuel vent tube reworked

' style=

The aux fuel doubler drilled in place on the firewall

The aux fuel doubler drilled in place on the firewall

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.