KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-3-2009
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Positioned Steel Straps to Pedals/Inst Subpanel Wo

I cut two more strips of the steel strap at 2 3/4" length and rounded off the ends using the Scotchbrite wheel. Replaced the wire ties with tie wraps betw/the pedals and the cables. Used the drill press to drill 3/16'' holes in the steel straps. I temporarily replaced the tie wraps with the straps. Enlarged the top of the map box opening in the instrument subpanel by 1/4'' with the Dremel cutoff wheel. Cleaned up the edges with the die grinder. Drilled a hole in the subpanel above the map box opening for the Dynon EMS wire bundle with a unibit. Enlarged it to a 5/8'' hole and installed a bushing. Drilled two 3/8'' holes at the top of the left F-604 side bulkhead one inch below each other for the headset jacks. I tightened the washers and rod-end bearings on the F-690 control rod and applied torque seal.

Visitors-Mom, Dad
' style=

Tie Wrap on Right Pedal/Cable

Tie Wrap on Right Pedal/Cable

' style=

Right Pedal/Cable with Steel Strap

Right Pedal/Cable with Steel Strap

' style=

Left Pedal/Cable with Steel Strap

Left Pedal/Cable with Steel Strap

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.