KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-3-2008
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Installed Components for Smoke Reservoir Installat

Started to install smoke system components. Drilled 3/8'' hole in aft corner end of right bracket, F-622, just in front of F-624. This is for an SB375-3 bushing for the tank vent. Drilled five #30 holes in the bottom of the fuselage for the vent fitting. Applied some RTV to the vent fitting and then riveted the vent fitting to the fuselage. I used the supplied solid pop-rivets to rivet the vent fitting. Drilled the tank brackets to the right baggage floor and ribs and installed K1000-08 nutplates in each corner of the tank brackets.
' style=

Right Baggage Side Panel

Right Baggage Side Panel

' style=

Holes in bottom of fuselage for the Smoke System Vent

Holes in bottom of fuselage for the Smoke System Vent

' style=

Hole for Smoke System Vent Tubing in bracket above the baggage side panel

Hole for Smoke System Vent Tubing in bracket above the baggage side panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.