KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  8-26-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Drilled Static Ports in Fuselage

Drilled 1/4'' holes in each side of the fuselage using a unibit for the static ports. Marked and drilled 6 pilot holes in each static port. Clamped each port in position and drilled rivet holes up to size. Deburred all holes. Swept out fuselage.
' style=

Static Ports Ready to be Drilled to Fuselage

Static Ports Ready to be Drilled to Fuselage

' style=

Left Side of Fuselage after Drilling Static Port

Left Side of Fuselage after Drilling Static Port

' style=

Static Port Clecoed to Fuselage

Static Port Clecoed to Fuselage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.