KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-24-2008
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Cleaned up Fuselage/Pilot Holes in Stringers

Took aft top skin off. Vacuumed out fuselage. Deburred some holes. Drilled out the two temporary pop-rivets that joined the aft ends of the stringers to the F-608 bulkhead. Clecoed skin back in place. Used nutplate jig to drill #40 holes in the five holes that were missed when back-drilling. Back-drilled the skin through the junction of the stringers to the F-608 bulkhead. Measured out pilot holes in the stringers between bulkheads F-606 and F-607 to be 1 1/4'' beginning from centerline of flange of F-607.

Visitor-Mom-signed fuselage.
' style=

Aft Top Skin Clecoed in Place

Aft Top Skin Clecoed in Place

' style=

Aft Top Skin Clecoed in Place

Aft Top Skin Clecoed in Place

' style=

Aft Top Skin Clecoed in Place

Aft Top Skin Clecoed in Place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.