KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-20-2008
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Readied Bulkheads F-607/-608, Stringers for Drilli

Cut out OSB boards in shape in bulkheads F-608 and F-607. Drilled holes in boards to insert clamps. Used large and small clamps to clamp boards to bulkheads to keep bulkheads straight. Double-checked centerlines on bulkheads and stringers. Drilled 1/16'' pilot holes in bulkhead F-607 and stringers. Clamped aft top skin to bulkheads F-607 and F-609 and drilled part of -607 flange to skin with 12'' #40 bit, starting in the center. Drilled partway down the stringers also.
' style=

OSB Board Used on Bulkhead F-608

OSB Board Used on Bulkhead F-608

' style=

Front of Bulkhead F-608 and OSB Board

Front of Bulkhead F-608 and OSB Board

' style=

Overhead View-F-608 Bulkhead

Overhead View-F-608 Bulkhead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.