KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-13-2008
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Drilled Right Front Floor Panel to Ribs

Drilled right front floor to ribs by first measuring centers of ribs and drilling #40 pilot holes in floor. After all holes were checked for accuracy, the holes were drilled up to #30, then #19 size. Deburred all holes in floor and ribs. Had to take both aft floor pieces and left front piece out 2-3 times to check alignment. Vacuumed out fuselage. Used nutplate jig to drill #40 holes in the ribs. Dimpled all holes with pneumatic squeezer. Did not drill holes in rib that will be modified for control stick, other than the aft-most hole.
' style=

Special Nutplate used at end of ribs

Special Nutplate used at end of ribs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.