KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-14-2008
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Riveted Electric Flap Components Together

Riveted nutplates onto EF-603 and then riveted EF-603 to F-605C, using the pneumatic squeezer. Used rivet gun and tungsten bucking bar to rivet EF-604 to EF-601. Used the battery from the portable drill to run the flap motor and extend the arm. Positioned the WD-613EF flap rod in position and then placed the EF-601 in position and screwed it in. Bolted the flap motor rod to the flap rod. Ran the flap motor up and down using the drill battery as the power source and found no problem.
' style=

EF-601 Screwed into Position

EF-601 Screwed into Position

' style=

Flap Motor and EF-601

Flap Motor and EF-601

' style=

Top End of EF-601

Top End of EF-601

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.