KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  4-1-2008
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Riveted Nutplates at Aft Baggage Flange

Placed baggage floor and aft bulkhead in place. Used angle drill and #19 bit to drill holes along bulkhead flange. Used nutplate jig to drill holes for rivets. Deburred and dimpled all holes. Used peumatic squeezer to install nutplates in baggage bulkhead floor. Used two MS21051-L08 nutplates at aft end of baggage center plate holes on ribs and flange. They have the two rivet holes on the same side.

Trimmed cardboard template to fit into left aft floor skin position.
' style=

Nutplates Riveted to Ribs/Aft Bulkhead Flange

Nutplates Riveted to Ribs/Aft Bulkhead Flange

' style=

MS21051-L08 Nutplate Riveted in Place

MS21051-L08 Nutplate Riveted in Place

' style=

MS21051-L08 Nutplate on Left Rib

MS21051-L08 Nutplate on Left Rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.