KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  12-3-2007
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Worked on Fuselage Bulkhead F-609/Drilled Hole in

Drilled F-609 bulkhead to F-614 and to longerons. Drilled pilot holes in F-609 for top fuselage skin. Deburred all holes. Used a 2 1/2'' hole cutter to cut out two holes in F-609 bulkhead. Used die grinder to smooth out edges.

Completed from 11/30/07-''Found that left side of fuselage skin near bulkhead F-609 had one hole not drilled in skin. The hole was drilled thru longeron. Need to drill hole thru skin, dimple it and rivet.''--Drilled hole thru skin; deburred; dimpled skin w/pop-rivet puller.

Used Scothbrite wheel to clean up edges of rudder pedals and pedal brackets, F-6117A's.
' style=

Bulkhead F-609 with Lightening Holes

Bulkhead F-609 with Lightening Holes

' style=

Fuselage Hole after Drilling/Dimpling

Fuselage Hole after Drilling/Dimpling

' style=

Fuselage Hole after Drilling/Dimpling

Fuselage Hole after Drilling/Dimpling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.