KitLog pro

Powered By Kitlog Pro v2.0

Bear with Me!
' style=
Date:  7-23-2015
Number of Hours:  5.70
Manual Reference:  
Brief Description:  Pouring Elevator Lead Counterweights

Set up and poured elevator counterweights.
Added a wooden handle to the cast iron skillet for a little distance between me and the hot lead.
Poured with the bottom side up. That would allow for the finish plate side to be the top.
A sheet of aluminum foil over the top of the pan speeds up the melting of the lead.
Smoothed the excess float on the bottom side of both elevators with a vixen file.

It looks like my experiment with high temp paint was not a failure. No eveidence of bubbling or smoking paint. On problem is where I rubbed the paint off with file or c-clamp.

Left them heavy for the material loss that will come with sandblast and prep for paint.
' style=

Added Handle for Safety

Added Handle for Safety

' style=

Bottom up, top smooth side!

Bottom up, top smooth side!

' style=

Got em dun!

Got em dun!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.