Brief Description: Centered and clamped longerons to jig.
This evening I clamped the bulkheads in place on the longerons again, and then centered the longerons to the jig. Next, I clamped the longerons to the jig to prevent any movement. I finished by drilling the F418 baggage ribs to the F407 bulkhead.