KitLog pro

Powered By Kitlog Pro v2.0

Greggs RV-4
' style=
Date:  9-12-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Parts fabrication, and forward belly skin

Today was a big day. It was gorgeous outside, and among other chores, I was able to get some cool items knocked out. I fabricated the rear mount for the control column, and it's associated pieces, and temp installed them into place. (Can be seen in image 3)

Next, I finally finished drilling the tiny area between the 411, and 412 bulkheads. (With tailwheel mount removed) Everything aft of F407 is now ready to be taken back apart, deburr/dimple/prime, and reinstalled for good.

Lastly, and the biggie for the day - I marked, measured, and cut (including the narrow wedge in the center - that is a pain in the butt) It is now taped in place on the skeleton. If you look at image 3 upside down, it looks pretty neat! I have a floor! Hopefully I can spend some time tomorrow drilling this large skin.
' style=

Prepunched? Prefabricated? NO.

Prepunched? Prefabricated? NO.

' style=

Fabricated, and taped in place.

Fabricated, and taped in place.

' style=

Geting closer to the canoe stage!

Geting closer to the canoe stage!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.