KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  1-28-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  VPX - more circuits

Finished terminal strip for AP circuits under right seat pan, between ribs. Added the AP power & Disconnect/CWS connections (Roll & Pitch) plus the SV-Net for Roll. Removed a portion of conduit to run bare harnesses instead.

Added AP Level wiring, including harness sleeve, shrink wrap and terminations.

Added DB9 for Serial cable connector to SV-D1000 (Display). Added Serial ground pin to J2 conector.

Other connectors, wire harness retainers, and shrink wrap. Tested RFI from laptop which is also causes hiss on A/C radio.
' style=

Right side ribs

Right side ribs

' style=

Minimum lighting

Minimum lighting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.