Re-located a couple of nutplates on the subpanel bottom flange for the Adel clamps on the control cables. Fastened all the control cables into the new 'removable' panel control cable insert, after priming and painting the insert bracket.
Wrapped harnesses with tie-wraps and added tie-wrap mount points on subpanel for securing the comm harness. Routed the PTT wiring for the control sticks thru the center floor area and spar. Revised the SV-Net cables on the Net hub in the equipment bay.