KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  1-13-2011
Number of Hours:  7.00
Manual Reference:  N/A
Brief Description:  Browsing for electrical supplies and tools

Placed orders with SteinAir and BandC for various tools, and electrical wiring supplies. Read through the online installation for the Dynon FilghtDEK D-180 and SkyView to better under the wiring requirements. Did the same with the Vertical Power VP-50 to understand how it affects all the other wiring runs, and configurations.

Ordered Dynon unheated pitot/AOA probe. Need to order SafeAir1 AOA kit for the AOA tubing run to the 'old' pitot location from Vans QB wings. Will have to get the pitot and AOA tubing into the left wing, and mount the probe.

No pics could describe the research. Coming down with a really bad sore throat, and losing work time ...
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.