KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  4-20-2016
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Cowl, (Hinges), FAB alt air, engine

Finished the cable for the Alt Air vent on the FAB, Added Adel clamps for the plug wires, Fixed the left hanger for the aft end of the ext tube.

Removed the clecoes from the vertical section (done 24 hrs before) and cleaned-up some lose resin, re-drilled the hinge holes with resin in them, and countersunk the fiberglass. Handed the rivets on the verticals.

Bedded the side & bottom hinges in the lower cowl in micro-balloon resin, and clecoed for the night. Made two new hinge sections for the 'lost' bottom (FW) hinge of the lower cowl and included in the bedding process.

Misc tasks ---
' style=

Alt air cable

Alt air cable

' style=

Plug wire Adels

Plug wire Adels

' style=

Bedded the side & bottom

Bedded the side & bottom

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.