KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  2-18-2017
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Post-instpection detail - adjust rigging on trim c

Still raining hard and expect thru the weekend, so carefully taking time the time to re-install covers and prep for First Flight.

The center position (level trim) for the elevator trim tab put the vernier knob further out than I wanted and decided to re-rig that system to better position the 'center' or 'level' flight position. Cut 1/2" from the trim tab horn and drilled a new hole for the clevis pin. Then backed off the cable lock-down threads to match, using a different clevis to get the 'sweet spot' desired.

The elevator trim knob is now centered slightly forward and has better feel, too.

Also added a temporary flight plan to the SkyView which is the perimeter of the Op Lim for Phase 1. Sure that this area will be familiar by the end of the 40 hrs for testing.
' style=

Elev trim clevis - & horn

Elev trim clevis - & horn

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.