KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  2-17-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Post Inspection - re-assembly

Started the process of re-installing inspecition covers and finalizing the other components like screws in the wingtips, and baggage bulkhead. Also installed the side covers over the flap tubes and the remaining side of the flap motor/arm housing.

Slept well after the inspection and still sore from the crawling, climbing, reaching and finishing preparation for the inspection. Could not finish the re-installations in one day.
' style=

Baggage bulkhead re-installed

Baggage bulkhead re-installed

' style=

Fairing under HS fastened

Fairing under HS fastened

' style=

R Wingtip screws installed

R Wingtip screws installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.