|
|
RV-6A - GBC
|
Date: 2-4-2007
|
Number of Hours: 4.50
|
Manual Reference:
|
Brief Description: Rudder Prelim assembly
|
|
Prepared the 'skeleton' parts, spar, ribs, braces, etc, and clecoed on the skin for final drilling to #40 for the skin, and #30 for almost everything else. Disassembled, deburred, dimpled, and primed them all.
Re-assembled, (clecoed), and then riveted per instructions but found a problem with the bottom K1000-6 nutplate theads. (May have damaged the first thread when enlarging hole in the spar and will need to order a clean nutplate replacement.) Determined the new nutplate CAN be adequately installed (riveted later thru the horn brace) so I finished the assembly and riveted the skeleton except for that replacement nutplate. * Photo 3
|
|
Top rib & counterbalance
|
|
Horn, brace, & Bottom Rib
|
|
Missing nutplate
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |