KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
' style=
Date:  12-31-2020
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Engine Control Cable Relocation Part 2

I only had an hour to work but I manged to Match drill the rivet holes for the throttle/Mixture/Prop cable hole doubler to the aft side of the gear tower. Deburred the holes and primed with Napa 7220 self ething primer.
' style=

Doubler rivet holes match drilled.

Doubler rivet holes match drilled.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.