Brief Description: Quadrant Cable Relocation Part 2
Continued work with the gear tower doubler for the forward side of the gear tower. Temporarily installed and drilled a 7/8" hole for the electrical conduit. Countersink the rivet holes. Primed and painted both sides of the doubler. Reinstalled doubler and blind riveted in place. Note enough room for a bucking bar for AN rivets. Reinstalled all quadrant cable and readjusted all throw on the cables.