KitLog pro

Powered By Kitlog Pro v2.0

Cleve's Web Site
' style=
Date:  9-11-2007
Number of Hours:  3.00
Manual Reference:  
Brief Description:  More baffle work- Angles on Rt. & Lt. floors

We did more fitting on the right and left baffle floors and the forward side walls. When we thought we had a good on the left, we drilled and riveted both of the angles on the top of the floor. In Image #1, you can see the angles in place, riveted and painted with heat resistant paint. While I was working on the left side, Claude was fabricating the angles and supports on the right. We have not drilled them yet but are close.
' style=

Angles riveted on Lt. Floor

Angles riveted on Lt. Floor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.