KitLog pro

Powered By Kitlog Pro v2.0

Cleve's Web Site
' style=
Date:  3-28-2007
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Ran strobe wires-Installed throtle quad

Today, I ran the 2 shielded strobe wires from the wings and the positive power wire up from the floor at the spar box and under the arm rest, into some conduit that I had painted, around the 705 bulkhead, and through the baggage bulkhead. I then put Molex pins on the wires which are now ready to install on the power supply. In the far left corner of Image #1, you can see the very edge of the mounting plate that will hold the supply. Image #2 show how I went around the main bulkhead. We had already drilled this bulkhead for the static line so I was reluctant to put another large hole through it.
While I was working on the strobe wiring, Claude enlarged the holes in the throttle quadrant so that they would accommodate the throttle, mixture, and carb heat cables. I don't plan to install a primer but you can see there is a place for it if I decide later I need one. Claude also installed Adel clamps on the throttle quadrant that goes on the subpanel. This will add support to the cables. The holes in the firewall have already been drilled.
We still have a great deal to do before we begin riveting the skin on the forward deck but we keep plugging along.
' style=

Run of strobe wires

Run of strobe wires

' style=

Strobe conduit around bulkhead

Strobe conduit around bulkhead

' style=

Throtle quad cables in place

Throtle quad cables in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.