KitLog pro

Powered By Kitlog Pro v2.0

Cleve's Web Site
' style=
Date:  11-11-2006
Number of Hours:  2.00
Manual Reference:  
Brief Description:  AOA flap switch & flap position switch installed

I wasa going to take the weekend off but just had to slip out Saturday afternoon to do a little to finish the flaps. Nell went with me and help me adjust the AOA flap switch to open at 10 degrees. It took much longer than I expected but I think that I have it right. I finished it except for installing a couple of pop rivets where you see clecoes in Image #1. I then installed the flap position switch on the flap actuator and got it adjusted. Will still need to wire it and install the circuit board somewhere. The weather was nice and when I didn't need help, Nell sat outside and read. This is the first time that she has been out to help and she performed like a champ!
' style=

AOA switch adjusted

AOA switch adjusted

' style=

Flap position switch installed

Flap position switch installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.