KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  9-30-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  IBBS Continuation, etc.

Once the IBBS brackets were completed, test fitted the brackets to the IBBS, and realized that one of the four pre-drilled holes in the IBBS itself is right under the connector. This will be quite unhandy when the IBBS needs servicing (removal)… but, it is what it is.

Located where I think the IBBS will reside, but am leaving until the very last minute to match drill the bracket to the floor.

Took the opportunity to adjust the pitot, static and AOA lines between the Garmin GDU-25 ADHAR and the Dynon D6. The original arrangement meant the lines were in conflict with the electrical connectors for both units. By re-orienting, now both units are clear for all required electrical connectors.
' style=

Not too handy to locate the hole right under the connector...

Not too handy to locate the hole right under the connector...

' style=

IBBS test fitted, waiting until the last minmute to match drill brackets to floor.

IBBS test fitted, waiting until the last minmute to match drill brackets to floor.

' style=

Pitot, Static and AOA minor adjustment...

Pitot, Static and AOA minor adjustment...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.