KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  6-17-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuel System - Bracket Relocation

Received the Electrical Subsystem Kit for the RV8 for the forward battery install, and a fuel filter bracket which I ordered for the new high pressure boost fuel pump.

The Electrical subsystem kit includes a wiring harness for the RV8, numerous switch circuit breakers, and circuit breakers, as well as general instructions for wiring the aircraft minus the avionics. The wiring harness, when laid out next to the airframe, looks just like a huge interconnect network, which I guess it is...

The bracket received is not what I wanted, no doubt it is what I ordered, but it is not what I need, Back to the plans for the correct part number...

Proceeded with the final location of the fuel filter bracket, drilled new holes and installed blind rivets (4) as required. Re-installed remaining fuel lines.
' style=

Here's the bracket I need !!

Here's the bracket I need !!

' style=

Installing fuel filter after final rivet of bracket

Installing fuel filter after final rivet of bracket

' style=

Reinstalling left wing tank line.

Reinstalling left wing tank line.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.