Powered By Kitlog Pro v2.0
TODD'S WEB SITE
RV-10
Horiztontal Stab
12-2-2006
< Previous Log Entry
Next Log Entry >
Date:
12-2-2006
Number of Hours:
3.70
Manual Reference:
Sec 8 - HS
Brief Description:
Moved clecos from right to left, final drilled lef
Moved all of the clecos from the right side to the left -- what a pain. Then final drilled the left skin assembly which completed the final/match drill process for the HS.
Moving clecos
Drilling left skin
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
481
732
Avionics
9
9
Cowling
16
16
Electrical
1
1
Elevators
46
83
Empennage
4
5
Empennage Attach
13
24
Engine
19
19
Fuselage
131
131
Horiztontal Stab
38
82
Inventory
2
4
Miscellaneous
2
2
Prop
5
5
Rudder
14
24
Tailcone
63
140
Vertical Stab
14
35
Wings
104
152
Copyright © 2001-2024 Matronics. All Rights Reserved.