Clecoed and final drilled all of the inspar and nose ribs to the front spar. Edge dedurred the skins and then proceeded to cleco the nose ribs in position followed by the front spar/inspar rib assembly. This was then clecoed to the skin. The hardest part was getting the nose ribs in place.