Brief Description: Rolled elevator leading edges, more deburring
This entry is acutally a compilation of a lot of smaller (15-20 min) entries that I've done over the past week. Most of that was deburring bulkhead sections. I'd run down and knock out a little bit under the practice of trying to do a little each day. On Saturday, with Toni's help, I rolled the leading edges. They turned out pretty good--better then the rudder, that's for sure. Ran into a little trouble with the inboard protion as the horn got in the way of the PVC pipe we were using. The solution was to get all of the outboard portions done on both elevators and then cut the pipe down so that it cleared the horn--worked like a champ. I then clecoed everything together.