Powered By Kitlog Pro v2.0
HB-YAK GS-2 Sportsman 2+2 kit
Sportsman 2+2
All
8-21-2021
< Previous Log Entry
Next Log Entry >
Date:
8-21-2021
Number of Hours:
2.00
Manual Reference:
Step 98
Brief Description:
Install the Steering Cables
Step 98: Install the Steering Cables (Taildragger Only)
Bulkhead E needs to be pierced to let the cable trough, but the laser points to the lowest screw of the elevator bracket - what to do ? I will check with my counsel.
Laser jig
hole in fuselage drilled
Laser pointing to spot to be drilled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sportsman 2+2 Home
Category
# Logs
# Hours
All
343
1748
Avionics
9
38
Empennage
6
34
Engine
51
288
Final assembly
126
535
Fuselage
37
94
Miscellaneous
13
235
Prop
5
20
Shop Supplies
1
8
System Installation
23
92
SYSTEMS INSTALLATION
23
92
Wings
49
312
Copyright © 2001-2024 Matronics. All Rights Reserved.