KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  2-8-2024
Number of Hours:  0.80
Manual Reference:  23-16
Brief Description:  Lower cowl patching and baffles

Patched holes in lower cowling from baffle clamping, plus some other divots.

Added a bit to the leading edge of the cowl baffles with 5-min epoxy/flox, then 1 x BID and peel ply.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.