KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  7-1-2023
Number of Hours:  7.00
Manual Reference:  25-02
Brief Description:  Finish sanding, and trial fit the cowling

Finished the 240g grind over the last couple of days, and am astounded when I do all parts with 320g, (again dry then wet) in a couple of hours. Everything now looks and feels gloriously sexy. I am quite excited!

I declare this bit done. then bolt on the bottom cowling to see how it is all coming together. I am not best pleased. A couple of fuselage areas need building up. even after grinding down the thick edge of the cowling a bit. I note after a while that some areas, (like the NACA bottom), have a little kick-up before the flange, and a lot of material beneath. I remove it, and mark up where build up is required and prep sand everything.

Applied FILL as required, including the aft cowl mods and filling the cowling to a 1mm gap with the fuselage using plastic spacers.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.