Brief Description: Port strake top skin installation
Clean up the inside of the Port fuel tank, then mound up the EZpoxy flow 1/2" high on all mounting surfaces inside the fuel tank, and MGS flox otherwise.
With Viki guiding the leading edge like last time, and under the supervision of Karen and Lorrene here for drinkies, install the top skin and weight for cure. Again the flox squooged out satisfactorily, and this time I was ready to use the excess to install the starboard OD bulkhead, which is also the outboard wall of my smoke oil tank.
I am tired, and am losing my sense of humour, so R57 taping is put off until tomorrow, and luggage compartment taping put off until the fuselage is inverted.