Screwed some pine framing to the workbench and hot glued the form on top.
Cut up the peel ply and discover I have run out!
Experiment with draping some UND over the strake leading edge form and discover it is pretty easy to make the fibres follow the BL. on the top and bottom side at the same time. This is one step toward my mad plan of doing the top and bottom skin at the same time, with the plane sitting on its firewall. If I can do layup #9 layer 2 in one piece I can do it all.