Powered By Kitlog Pro v2.0
Home of the Spodplane
COZY MK IV
All
2-13-2016
< Previous Log Entry
Next Log Entry >
Date:
2-13-2016
Number of Hours:
4.60
Manual Reference:
13-05/11
Brief Description:
Ballast Compartment
Trimmed layups, profiled flox around nose bumper.
Marked and cut inspections window in Ballast Hatch & cut foam for backing flange.
Cut up most of my remaining BID for tapes.
Micro'd backing foam to Ballast Hatch interior.
4 x BID around nose bumper, overlapping 1" onto bumper and nose.
Hot glued NG-31, aft side down, to work bench. Floxed and taped NG-32's to NG-31, forming a flange aft.
Started cutting nose upper brace foam. No BID left to cover it.
Marking Ballast Hatch window
Taping on NG-32
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
COZY MK IV Home
Category
# Logs
# Hours
All
1566
3544
Casa del Spodd
4
2
CH03 - Repair
2
5
CH04 - Fus Bulkheads
36
64
CH05 - Fus sides
17
53
CH06 - Fus Assembly
36
85
CH07 - Fus Exterior
31
58
CH08 - Fus Innards
26
52
CH09 - MLG
97
219
CH10 - Canard
56
115
CH11 - Elevators
38
58
CH12 - Fit Canard
12
19
CH13 - Nose
144
261
CH14 - Center Spar
53
117
CH15 - Firewall
12
38
CH16 - Controls
52
76
CH17 - Air Brake
6
8
CH18 - Canopy
135
361
CH19 - Wings
177
409
CH20 - Winglets
94
179
CH21 - Strakes
144
369
CH22 - Electrical
1
1
CH23 - Engine & Cowl
95
270
CH24 - Seats, Armres
132
228
CH25 - Finishing
146
474
Materials
6
4
Miscellaneous
2
5
Shop Supplies
2
8
TC reports
10
6
Copyright © 2001-2024 Matronics. All Rights Reserved.