KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
' style=
Date:  11-18-2021
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Continued Interior work

1. Finished installing the leather wrap for the lower part of the pilots door.
2. Installed the weather seal on the pilots door.
3. Started installing the dash cover.
4. Installed the baggage door inside cover.
5. Modified the upper part of the back baggage wall for the overhead console.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.