KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
' style=
Date:  8-19-2021
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Engine stuff

Installed the prop govener.
Made a cover plate for the assessory pad for where the fuel pump would go.
Created an aluminum version of the EFII position sensor bracket.
' style=

EFII position sensor bracket in foreground.  Prop heat  slip ring brushs bracket in the background.

EFII position sensor bracket in foreground. Prop heat slip ring brushs bracket in the background.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.